
TOULOUSE, France - Thales Alenia Space announced a contract on November 23, 2026. It exceeds €240 million. The prime contractor is OHB System AG. The contract is to build altimeters for Europe's first Sentinel-3 Next Generation Topography satellite.
The Thales and Leonardo joint venture will supply instruments. It works for the European Space Agency. It falls under the European Union's Copernicus program. The supply includes a traditional nadir radar altimeter and SAOOH, a new wide-swath interferometric instrument.
SAOOH scans a 100-kilometer-wide swath. That is 50 kilometers on each side of the satellite's track. It will deliver two-dimensional water-height maps. It will resolve ocean eddies down to 50 kilometers and achieve near-complete ocean coverage in five days.
Previous altimetry missions helped scientists document a rise. It is an average global sea-level rise of 3.3 millimeters per year.
The constellation is upgraded. It will deliver river, lake, and reservoir measurements within six hours for flood and drought response.
CEO Hervé Derrey said this. “Our company will leverage its proven expertise in space altimetry to address this new Copernicus mission, providing unprecedented oceanographic and hydrological data to the scientific community to better understand climate change.”
Industry analysts at Futurum Group noted it. The date was November 23. The satellite feeds sub-six-hour hydrological data directly to emergency services. Because of that, ground-segment cybersecurity and post-quantum encryption standards will draw close scrutiny ahead of 2027 integration milestones.